Total use has been manufactured of all types of advanced tactics and engineering to reach excelsior manufacturing.
Supplies |
1. metal:Aluminum/Steel/Alloy steel/Stainless metal/Brass,copper,bronze etc. 2. plastic: Stomach muscles,POM,PE,PP,PVC,Laptop,PMMA,Teflon,nylon and many others. 3. others: carbon fiber, glass,fiberglass, wood, hard rubber etc. |
Colour |
Silver, Gray, Black ,Gold or as client’s need |
Surface Roughness |
Ra0.eight ( without sprucing or grinding) |
Brand Strategy |
laser engraving, CNC engraving, display-printing and many others. |
Surface Finish |
Anodize sharpening zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be personalized |
Certification |
ISO SEPG |
Processing equipments |
CNC machining middle,NC lathe, Grinding machine, Automated lathe device, Conventional lathe equipment,Milling machine,Drilling machine,EDM,Wire-reducing equipment,CNC bending device and so on |
Tests machine |
Coordinate measuring machine,Picture measuring instrument,Caliper and so on |
Application |
Healthcare Devices/Digital/ Industrial// Automation / motorcycle/3D printer |
Support |
OEM,ODM or as client’s requirement |
“EPG” manufacturer rotocultivator ploughshares in T.S. whole traces made in our manufacturing facility have been tested and appraised by the Ministry of Agriculture and have obtained the license of popularizing farm equipment promulgated by the Ministry of Agriculture of the People’s Republic of China. Packaging & Delivery
Packaging Information
one. inner packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and many others.
two. outer packaging: carton box, picket situation, plate etc.
three. as for every customers’ necessity
Port
xiamen, or as client’s prerequisite
Guide Time :
Quantity(Items) | 1 – 20 | 21 – 100 | 101 – 1000 | >1000 |
Est. Time(days) | 5 | 10 | twenty five | To be negotiated |
Trade Terms | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s requirement |
Transport | By air (DHL,UPS,Fedex,EMS and many others.),By Sea,Convey… |
Payment Approach | T/T(lender transfer),L/C,paypal,western union, moneygram,escrow, money and so on |
Payment Phrases | 50% ahead of production, fifty% ahead of supply |
Packing | internal box,several boxes/master carton or as customer’s necessity |
Shipping and delivery time | 5-7days for Alanple time,five-25 days for manufacturing |